Going live
Three weeks to the first dial: what happens in each one.
A new SDR takes an average of three months to ramp. An engagement with us takes three weeks to the first call, because the ramp already happened somewhere else. What each week contains, and what you will be asked for.
Samuel Parsons2 min read
Three weeks is the time between the brief and the first dial. It is not a ramp - the rep already knows the job - it is the time it takes to build a market properly: the board, the messaging, the mailbox, the qualification. The Bridge Group puts a new hire’s ramp at 3.0 months on average; the difference between three weeks and three months is that the learning here is about your market, not about the work.
Week one: the brief, the board and the first draft of the messaging
An hour with you on the five questions - what you sell, who buys it and why now, what a good meeting is, who takes it, what not to say. Then the platform goes to work on your market: the companies that fit, found by what they are doing rather than their industry code; the signals that put each one on the board; the people to speak to, found and verified. The opening lines are drafted from those signals. By the end of the week you see the board and argue with it. If the market is thin, this is where we say so, and if the brief described four thousand companies, this is where it gets narrower.
What you are asked for: the hour, a look at the board, and any names to leave off it.
Week two: the set-up
- A mailbox on your domain, created, authenticated (SPF, DKIM, DMARC) and warmed, so the first real email lands in an inbox.
- The sequences, written from the signals on the board rather than from a template - the first line of each email is the reason that company is there.
- The scripts and the objection handling, drafted from the brief and agreed with you.
- The qualification criteria, in writing, so a meeting is only a meeting if it fits.
- The rep briefed on your market, your tone and your product, with the manager, from the board.
What you are asked for: an hour to review the messaging and the criteria, and a decision on whose diary the meetings go into.
Week three: the first dial
The queue is built the night before and ordered by who is likely to pick up. The rep starts the morning on a call. Email and LinkedIn run on the same cadence. The manager is listening. The first conversations happen this week; the first replies to the day-one emails arrive over the next fortnight; and the first qualified meetings are booked inside the first month.
What you are asked for: nothing, except to be ready when the first meeting is booked.
Then
Weekly numbers and a fifteen-minute read-out. The sequence gets its second version a week after its first, built from what got answered. The board is re-sorted as signals arrive. By month two you know whether your market responds to outbound and how, which is the question a first hire answers in month six.
Sources: Ramp figure from The Bridge Group, 2025 SDR Models and Metrics report.
Fifteen minutes. No pitch.
If this describes where you are, fifteen minutes on a call will tell you what outbound would return on your market.
Book a call →Read next